best websites to write essays

Category Archive for: News

RELEACH project present at 10th ISEB Conference

Life+ Releach was present at the 10th ISEB Conference held in Barcelona on June 1 – 3, 2016. The primary objective of the conference was to bring together scientists and practitioners to catalyse and advance scientific knowledge on environmental biotechnologies, and to present the most recent integrated technological innovations to face environmental problems. The scientific…

Read More →

Installed the pilot plant container for biological pretreatment of leachate

The past 5th of April the the container for biological pretreatment of leachate was installed at  Consorci del Bages per a la Gestió de Residus facilities as the first part of Releach pilot plant installation.  

Visit to landfill facilities in Manresa before pilot plant

On March 11th took place a technical visit to Consorci del Bages per a la Gestió de Residus facilities to ultimate the preparations before the Releach pilot plant instalation. Tecnicians from Typsa, Protecmed and Fundació CTM attended the meeting.

Initiated the proceedings to install the pilot plant in Orís

The proceedings to install the pilot plant in Orís landfill by 2017 were initiated in a meeting between CTM and Consorci per la Gestió de Residus Urbans d’Osona which took place at Orís landfill facilities.  

Second review meeting RELEACH

The second review meeting of the RELEACH project took place last December 14th of 2015 at CTM facilities. Representatives of all the beneficiaries attended the meeting, as well as the project monitor from NEEMO. The attendees reviewed the current state of the project which is slightly behind schedule due to a delay in the deliver…

Read More →

Third technical meeting

The third technical RELEACH project meeting took place at CTM facilities in Manresa on June 19th. Protecmed, CTM and EDR membrane manufacturers, AGV Selemion attended the meeting. Electrodialysis reversal laboratory tests were shown to membrane manufacturers and results obtained so far were discussed. The meeting was useful to help partners understanding the results and improving…

Read More →

Second technical meeting

The second technical meeting took place on May 5th in Manresa and was attended by Protecmed, CTM and Typsa. The attendees examined the laboratory results so far. The results of landfill leachate pre-treatment step from both physicochemical and biological approaches were shown, as well as the results from low pressure filtration tests. As the biological…

Read More →

sand_filtration_system

Sand filter vs ultrafiltration of leachate pre-treatment

Before the membrane concentration phases of the novel process for treating landfill leachates proposed in RELACH, the biologically pre-treated leachate obtained from the SBR, needs to be clarified in the last step of leachate pre-treatment. This clarification stage has been approached from two different techniques: sand filtration and ultrafiltration. The aim of this last pre-treatment…

Read More →

Back to Top